A labour contract is a construction agreement in which the owner buys all materials and the contractor supplies only workers and their tools, usually paid per square foot of built-up area. A turnkey contract is one where the contractor supplies labour, materials and management for an agreed rate or lump sum and hands over a finished house. The difference decides who controls quality and who carries price risk.
Also known as: labour rate / labour-only contract; turnkey = material-and-labour contract, “full contract”, “with material” rate.
Quick facts
| Labour contract | Owner buys materials; contractor supplies labour; owner manages more |
| Turnkey contract | Contractor supplies everything; owner pays a rate per sq ft or lump sum |
| Price risk | Labour: owner bears material price rises. Turnkey: contractor does, unless there’s an escalation clause |
| Key document | Written construction agreement with specifications |
| Payment | Stage-wise, against completed work |
The two contract types explained
With a labour contract, you choose every brand and grade of cement, steel and sand, and you see every bill. That control can save money, but you have to arrange deliveries, track stock, prevent wastage and make sure the site never stops for lack of material. It suits owners who can visit the site often or have a trusted engineer.
A turnkey contract is simpler to manage, but the contractor chooses materials within the specification, and their profit depends on what they spend. The specification therefore becomes your main protection. A rate like “₹X per sq ft” means nothing without a detailed list: cement and steel brands, tile price per sq ft, sanitaryware make, number of electrical points, door material, paint system, what’s excluded (compound wall, sump, borewell, approvals, electricity connection). Most turnkey disputes are about exclusions and “upgrades”. See rate-per-sq-ft exclusions.
How buyers get cheated
- Vague specification. “Standard tiles”, “branded fittings”. Insist on brands, grades and allowance amounts in writing.
- Built-up area inflated. Turnkey rates applied to an area that includes balconies, headroom or sunshades at full rate. Agree how area is measured.
- Front-loaded payments. Large advances before work. Tie payments to completed stages.
- Labour contractor’s “material advice”. Some labour contractors earn commission from suppliers. Get your own quotes.
Related terms
Construction contract agreement · Rate-per-sq-ft exclusions · Stage-wise payment schedule · Escalation clause · Mason (mestri) · Advance-and-abandon contractor · BOQ
Go deeper
- House construction cost in India (per sq ft)
- Construction companies & contractors near you
Frequently asked questions
Which is cheaper: labour contract or turnkey?
A labour contract can be cheaper if you buy well and control wastage. Turnkey includes the contractor’s margin on materials but saves your time and management effort. Compare full costs, not just headline rates.
What should a turnkey contract include?
Drawings, a detailed specification with brands and allowances, area measurement method, stage-wise payment schedule, timeline with penalties, exclusions list, warranty and defect liability, and a dispute clause.
Is a written contract necessary for a labour contract?
Yes. Even a simple written agreement on scope, rate, measurement and payment stages prevents most disputes.
Review and sources
- Indian Contract Act, 1872
Related: Cost calculator · BOQ (Bill of quantities) · Construction cost per sq ft calculator · BuildPedia