A building plan sanction is the official approval of a building’s drawings by the local planning authority, granted before construction starts. In Bengaluru this is the city corporation (BBMP, now under the Greater Bengaluru Authority) or BDA, depending on location. The sanction confirms the design follows zoning and building bylaws on setbacks, floor area ratio, height, parking and use.
Also known as: plan approval, building licence, sanctioned plan, “BBMP approval”.
Quick facts
| Issued by | City corporation, development authority (BDA, BMRDA, MUDA etc.) or panchayat, by location |
| Typical documents | Title deed, khata and tax receipt, EC, drawings by a registered architect, structural certificate |
| Checks | Setbacks, FAR/FSI, ground coverage, height, parking, land use |
| Fees | Scrutiny fee, licence fee, betterment and other charges as applicable |
| After completion | Occupancy certificate confirms the building matches the sanction |
Plan sanction explained
Bylaws exist to keep cities livable: setbacks for light and air between buildings, FAR to control density, height limits near airports and narrow roads, and parking so streets aren’t blocked. The sanction is the authority’s confirmation that your drawings respect these rules for your plot size and road width. Most authorities in Karnataka now accept applications online.
A sanction is only useful if you build what was approved. Deviations, like an extra floor, encroaching into setbacks or converting parking into rooms, can block your occupancy certificate, attract penalties, make bank loans and resale harder, and in serious cases lead to demolition notices. Keep the sanctioned drawings on site and make sure your contractor builds to them.
How buyers get cheated
- Fake sanction copies. Verify the sanction number with the issuing authority.
- Built beyond sanction. When buying a finished house, compare the building with the sanctioned plan. See unapproved deviation sold as legal.
- “Approval not needed for small houses.” Requirements vary but almost all urban construction needs some approval. Check with the authority.
Related terms
Setback · FSI / FAR · Occupancy certificate · Commencement certificate · Deviation from sanctioned plan · BBMP · Building bylaws
Go deeper
Frequently asked questions
Do I need plan approval to build a house in Bengaluru?
Yes, construction generally needs a sanctioned plan from the competent authority. Some small residential buildings may have simplified procedures; check the current rules.
Can I get plan sanction on a B-khata site?
Generally it is difficult, because B-khata indicates irregular land or layout status. Rules have changed over time; consult the authority or a lawyer.
How long is a building sanction valid?
Sanctions have a validity period within which construction must start or finish, and can often be renewed. Check the period printed on your sanction.
Review and sources
- BBMP Building Bye-laws, 2020
- Revised Master Plan / Zoning Regulations, Bengaluru (BDA)
This entry explains general concepts and is not legal advice. Rules differ by state and change over time; check the current position with the relevant authority or a qualified property lawyer before acting.
Related: Occupancy certificate (OC) · How to build a house in India · Building plan approval in Belagavi · BuildPedia
- BBMP: building plan approval in Bengaluru.
- e-Aasthi: property records needed for plan approval in other cities and towns.