HDMC Building Plan Approval: Hubballi-Dharwad Step-by-Step Checklist

Before you build a house in Hubballi-Dharwad you need a sanctioned building plan. Start the paperwork before you finalise the design: most delays come from title papers or a khata that is not in order, not from the drawings.

Which office approves your plan?

  • Inside corporation limits: the Hubballi-Dharwad Municipal Corporation (HDMC) town planning section. The state has approved splitting Dharwad into its own municipal corporation, so plots in Dharwad should confirm which office handles their application during the transition.
  • Outside corporation limits, in villages: the gram panchayat, where the property record is the e-Swathu extract (Form 9 or Form 11).
  • Land use and zoning: the Hubballi-Dharwad Urban Development Authority (HDUDA) master plan decides what can be built in each zone.

Papers to keep ready

The exact list is shown when you apply. These are the papers usually asked for in Karnataka cities:

Step by step

  1. Check zoning and setbacks. Confirm the land use for your plot in the master plan, and the setbacks, FAR and height your plot size allows. Our plot feasibility tool gives a first estimate.
  2. Put the papers in order. Fix any mismatch in names, survey numbers or measurements between the sale deed and the khata before applying.
  3. Get the drawings made. A registered architect or engineer prepares the drawings to the bylaws. Use our plan generator to brief them.
  4. Apply. Karnataka cities accept building plan applications through the state’s online Land and Building Plan Approval System; the HDMC town planning section can confirm the current portal and how to submit.
  5. Scrutiny and site inspection. The drawings are checked against the bylaws and an official may visit the plot.
  6. Pay the fees. Fees are worked out from the built-up area and shown on your application. Pay only through the official channel and keep the receipt.
  7. Receive the sanction. Build exactly to the sanctioned plan and start within its validity period.
  8. After construction: apply for the occupancy certificate and update your khata and property tax for the new building.

Common reasons for delay or rejection

  • Khata or tax receipt not in the applicant’s name.
  • Agricultural land without conversion, or a plot in an unapproved layout.
  • Setbacks or FAR beyond what the bylaws allow.
  • Plot measurements on the drawing that do not match the documents.

Next steps

Follow the full home-building journey for what comes after approval, or read about the black cotton soil foundations common across Hubballi-Dharwad.

Rules, forms, portals and fees change. Confirm the current requirements with the HDMC town planning section or your architect before you apply.

Official sourcesLinks checked 1 November 2026. Rules and fees change; the HDMC town planning section is the final word.