Enter the concrete volume and the grade to estimate cement, sand and aggregate. This is an estimate; your engineer’s mix design governs.
How it is calculated
Dry volume = wet volume × 1.54, the usual allowance for voids between sand and aggregate. Cement, sand and aggregate are shared in the mix ratio. Cement volume = dry volume ÷ total parts. Cement bags = cement volume ÷ 0.0347 m³ per 50 kg bag. Sand and aggregate volumes follow the ratio. Wastage is added and cement is rounded up.
Worked example
For 1 m³ of M20 (1 : 1.5 : 3, total 5.5 parts): dry volume = 1.54 m³; cement = 1.54 ÷ 5.5 = 0.28 m³, about 8.1 bags; sand = 0.42 m³; aggregate = 0.84 m³.
FAQs
Is this the same as the mix design? No. It is a planning estimate using typical volume ratios. Use the engineer’s mix design and tested cube results for the job.
Does ready-mix concrete need this? No. Order the volume directly and check the delivery tickets.