Brickwork is the construction of walls, piers and other elements by laying bricks in cement or lime mortar in a regular bond pattern. Good brickwork has level courses, plumb faces, uniform joints fully filled with mortar, and staggered vertical joints so the wall acts as one unit. In framed RCC houses, brickwork mainly forms infill and partition walls between columns and beams.

Also known as: brick masonry, brick wall work, itige kelasa (Kannada).

Quick facts

CodeIS 2212 (brickwork code of practice)
Common bondsEnglish, Flemish, stretcher, rat-trap
Wall thicknessHalf-brick (about 115 mm) and one-brick (about 230 mm) are common
MortarCement-sand, ratio as specified (e.g. 1:6 for walls)
MeasurementCubic metre (thick walls) or square metre (half-brick walls)

Explained

Red clay bricks remain common across Karnataka, though many builders now use AAC blocks, concrete blocks or fly ash bricks. Whatever the unit, the craft rules are similar. Bricks are soaked before use so they do not suck water from the mortar. Joints are kept around 10 mm and fully filled. Each course is checked with a spirit level and the face with a plumb bob.

The daily height of brickwork is limited so lower courses can set before more load is added. Walls should be bonded or tied to columns, and the top course packed tightly under beams after the wall has settled. Lintels go over openings. Curing with water for several days helps the mortar gain strength.

Poor brickwork shows up later as cracks at wall-column junctions, uneven plaster thickness and hollow-sounding walls.

How buyers get cheated

  • Dry, half-filled joints. Check joints are filled with mortar, especially vertical joints, before plastering hides them.
  • Broken bricks used inside. Look at cut sections and corners for bats used in place of full bricks.
  • Weak mortar mix. Count cement bags used per day against the brickwork done.

Related terms

Red clay brick · English bond · Flemish bond · Brick soaking · Cement mortar · Line, level and plumb · Block masonry

Go deeper

Frequently asked questions

How much brickwork can be built in a day?

Codes and good practice limit the height laid in one day so mortar can set before more load is added. Ask your engineer for the limit on your site.

Why should bricks be soaked before laying?

Dry clay bricks absorb water from fresh mortar, leaving it weak and poorly bonded. Soaking prevents this. AAC and some concrete blocks need only light wetting.

Why do cracks appear between brick walls and columns?

Brick and concrete move differently with temperature and moisture. Without ties or chicken mesh at the junction, a hairline crack often forms. Proper detailing reduces it.

Review and sources

  • IS 2212, Code of Practice for Brickwork
  • IS 1077, Common Burnt Clay Building Bricks — Specification

Related: IS 2212 (Brickwork) · Brick calculator · AAC block calculator · BuildPedia