Temporary Power Connection

A temporary power connection is an electricity supply given for a limited period, most commonly during construction of a house or building, before the permanent connection. In Karnataka, it is provided by the local electricity supply company, such as BESCOM in Bengaluru, under a temporary supply tariff that is usually higher than domestic rates. It is closed or converted once permanent supply is sanctioned.

Also known as: construction power, temporary meter, LT-7 connection (Karnataka tariff category).

Quick facts

Provided byBESCOM, MESCOM, HESCOM, GESCOM, CESC depending on area
Used forConstruction machines, lighting, water pumps on site
Typical documentsOwnership proof, plan sanction, ID
TariffTemporary supply tariff, higher than domestic
DepositSecurity deposit collected, refundable on closure

Explained

A construction site needs power from the start: for mixers, vibrators, bar cutters, pumps for curing and lighting. Rather than run a diesel generator, most owners apply for a temporary connection. The supply company installs a meter for the site, sometimes on a pole, and bills at the temporary tariff for the period of construction.

When the house is complete, the owner applies for permanent connections, usually domestic, with the required load. In some cases the supply company asks for the occupancy or completion certificate before permanent connection. The temporary meter is then closed and the deposit refunded after dues are cleared.

Apply in the owner’s name, keep bills paid, and close the temporary connection properly. Consult the supply company for the current procedure.

How buyers get cheated

  • Contractor taps neighbour’s supply. Insist on a proper temporary meter in your name.
  • Unpaid temporary bills. On buying a newly built house, check that the temporary connection is closed and dues are cleared.
  • Agent charges for “quick connection”. Apply through the official portal and pay fees to the supply company directly.

Related terms

Utility NOCs · Sanctioned load · Three-phase connection · Energy meter · Occupancy certificate · Construction water supply

Go deeper

Frequently asked questions

How do I get a temporary power connection for construction?

Apply to your electricity supply company, online or at the sub-division office, with ownership proof, plan sanction and ID. Pay the fees and deposit, and the company installs a temporary meter at the site.

Why is the temporary tariff higher?

Temporary supply is a separate tariff category set by the electricity regulator, generally priced above domestic supply. Keep construction power use efficient to control bills.

Can a temporary connection be converted to permanent?

Usually you apply for a new permanent connection once the building is complete, and the temporary connection is closed. Procedures vary by supply company.

Review and sources

  • Bangalore Electricity Supply Company Ltd (BESCOM)
  • Karnataka Electricity Regulatory Commission — tariff orders

This entry explains general concepts and is not legal advice. Rules differ by state and change over time; check the current position with the relevant authority or a qualified property lawyer before acting.