Right of Way

Right of way has two common meanings in property. First, it is an easement: the legal right of a property owner to pass across someone else’s land to reach their own. Second, in planning, it is the full width of land reserved for a public road, including carriageway, footpaths and drains. Both affect whether a plot has legal access and how much can be built.

Also known as: RoW, access right, road right of way.

Quick facts

As an easementGoverned by the Indian Easements Act, 1882
As road widthSet in the master plan / CDP road network
Why it mattersLegal access; zoning rules often depend on road width
Road wideningLand within planned RoW may be acquired, sometimes with TDR
Best proofPublic road in records, or a registered right-of-way deed

Explained

A plot is only as useful as its access. If the only path to a plot crosses private land, the owner needs a right of way, ideally written into a registered deed. Without it, a neighbour can block the path, and the local body may refuse plan sanction because the plot does not abut a road. Interior plots in revenue layouts around Karnataka towns often have this problem.

In the planning sense, the master plan fixes a right-of-way width for each road. Zoning rules use this width to decide FAR, height and permitted uses. If the planned width is greater than the existing road, part of a plot along the road may be reserved for widening, reducing its usable area. Bengaluru road-widening projects have taken frontage from many properties.

Check both meanings before buying. Consult a property lawyer and the master plan.

How buyers get cheated

  • “Road” that is private land. Confirm the access road is public in records or covered by a registered easement.
  • Road widening ahead. Check the master plan RoW width against the existing road.
  • Width overstated. Measure the road; a narrower road may limit floors and uses.

Related terms

Easement rights · CDP · TDR · Zoning regulations · Revenue site · Setback

Go deeper

Frequently asked questions

Can I build on a plot without road access?

Most bylaws require a plot to abut a road of minimum width for plan sanction. A landlocked plot usually needs a registered right of way first. Check with your architect and the local body.

How do I check the planned road width in front of my plot?

Look at the master plan or CDP road network map for the area, or ask the planning authority. Compare it with the existing road to see if widening is planned.

Is a right of way by long use valid?

Long, open and uninterrupted use can create a prescriptive easement under the Easements Act, but proving it may need a court case. A registered deed is far safer.

Review and sources

  • Indian Easements Act, 1882
  • Karnataka Town and Country Planning Act, 1961

This entry explains general concepts and is not legal advice. Rules differ by state and change over time; check the current position with the relevant authority or a qualified property lawyer before acting.