Centring & Shuttering (Formwork)

Centring and shuttering is the temporary formwork that holds wet concrete in the shape of a slab, beam or column until it has hardened enough to support itself. Shuttering is the mould surface, made of steel plates or plywood; centring is the supporting system of props, beams and bracing underneath. On Indian sites, “centring” is often used for the whole job.

Also known as: formwork, centering, shuttering work, “centring material”.

Quick facts

MaterialsSteel plates, shuttering plywood, steel props, timber or steel runners
Done byA centring contractor, usually on hire
Removal timeSet by IS 456 guidance and the engineer, depending on element and span
GuidelinesIS 456 (stripping times), IS 14687 (formwork guidelines)
Main risksCollapse during pouring, slurry leakage, sagging or bulging concrete

Centring and shuttering explained

Wet concrete is heavy and fluid. A slab pour puts a large load on the formwork, plus the weight of workers and equipment, all before the concrete has any strength. The props must be vertical, on firm ground or a solid floor, spaced as planned and braced so they don’t buckle. The shuttering must be tight, level and oiled so concrete doesn’t leak out or stick.

The quality of formwork shows directly in the finished concrete. Gaps let cement slurry leak out, leaving honeycombed concrete. Weak props let a slab sag, producing a permanently uneven ceiling. Removing props too early, to move material to the next job, can crack or deflect the slab. Most slab collapses on house sites are formwork failures, not design failures.

How buyers get cheated

  • Early de-shuttering. Props removed in a few days so the contractor can reuse them elsewhere. Agree removal times with your engineer in writing.
  • Too few props. Wider spacing than planned to save hire charges. Check before the pour.
  • Worn-out plates and ply. Dented plates and swollen ply give a wavy surface and leaks. Inspect the material before it’s fixed.
  • Levels not checked. Ask for the level to be checked with a water level or laser level before pouring.

Related terms

Centring contractor · Steel props · Shuttering plates · De-shuttering time · Slab casting · Honeycombing · Sagging slab

Go deeper

Frequently asked questions

What is the difference between centring and shuttering?

Shuttering is the surface that forms the concrete’s shape; centring is the support structure that holds it up. Together they are called formwork.

When can slab shuttering be removed?

Side forms come off early, but props under a slab stay longer depending on span, cement type and weather. IS 456 gives guidance; your engineer decides for your slab.

Steel plates or plywood shuttering: which is better?

Steel plates are reusable and common for slabs. Shuttering plywood gives a smoother surface and suits beams and columns. Both work if they’re in good condition and properly supported.

Review and sources

  • IS 456, Plain and Reinforced Concrete — Code of Practice (formwork and stripping time)
  • IS 14687, Guidelines for Falsework for Concrete Structures